Accessibility Tools

  • Increase text
  • Decrease text
  • High contrast
  • Negative contrast
  • Add grayscale
  • Remove grayscale
  • Add lightbackground
  • Remove lightbackground
  • Reset
Created on LEED Interpretation

ID#

li-1777

Credit NameEQc10 - Garage pollutant protection
Credit CategoryIndoor environmental quality
International ApplicableNo
Campus ApplicableNo

Rating System

LEED BD+C: Homes, LEED BD+C: Multifamily Midrise

Rating System Version

v3 - LEED 2008

Inquiry

Generally, where is the garage plane defined for IEQ credit 10? If the supply ducting is installed above the garage, is that acceptable? The ducts are sealed, and the garage ceiling is painted drywall and sealed using caulked Thermopan and spray foam.

Logging out the application..