Accessibility Tools

  • Increase text
  • Decrease text
  • High contrast
  • Negative contrast
  • Add grayscale
  • Remove grayscale
  • Add lightbackground
  • Remove lightbackground
  • Reset
Created on LEED Interpretation

ID#

li-1829

Credit NameEAp2 - Minimum energy performance
Credit CategoryEnergy & atmosphere
International ApplicableYes
Campus ApplicableNo

Rating System

LEED BD+C: New Construction, LEED ID+C: Commercial Interiors, LEED BD+C: Core and Shell, LEED BD+C: Schools

Rating System Version

v3 - LEED 2009, v2 - Schools 2007, v2 - LEED 2.2

Inquiry

The project is a 3,000 square foot 1-story new office building. The requirements of this prerequisite are to comply with the mandatory provisions (sections 5.4, 6.4, 7.4, 8.4, 9.4, and 10.4) of ASHRAE/IESNA Standard 90.1-2004 and the prescriptive requirements (sections 5.5, 6.5, 7.5, and 9.5) of ASHRAE/IESNA Standard 90.1-2004. ASHRAE/IESNA Standard 90.1 2004 Section 8.4.1.1 states "Feeder conductors shall be sized for a maximum voltage drop of 2% at design load." The exception we would like to take is as follows: We meet all the other requirements of this prerequisite for minimum energy efficiency requirements. Our design is approximately a 2.9% voltage drop, which meets the latest edition of the National Electric Code 215-2(A)(2) FPN#2 which allows between 3-5% voltage drop. The cable size is parallel 500 MCM. To meet the 2% requirement, the cable size would be increased to parallel 750 MCM. This is a significant cost increase to the project without gaining any energy savings. Will the 2.9% voltage drop be acceptable to use?

Logging out the application..