For gut -rehab projects, where most of the site is pre-existing designed landscapes and may include turfgrass, what should be included in the calculation for SS 2.3? All existing designed landscapes, or only newly designed landscapes (i.e. areas of the site disturbed during the rehab)?
By clicking logout button below, you will be logged out of all the USGBC and GBCI applications in this browser.
Click the logout button below to continue logging out or cancel button to stay logged in.