ID#
li-1911
| Credit Name | EAc1 - Optimize energy performance |
|---|---|
| Credit Category | Energy & atmosphere |
| International Applicable | No |
Rating System
LEED BD+C: New Construction, LEED BD+C: New Construction, LEED BD+C: New Construction
Rating System Version
v2 - LEED 2.0, v2 - LEED 2.2, v2 - LEED 2.2
Inquiry
Our project has a city zoning requirement for artwork to be installed on our site. The artist that the owner has selected is creating sculptural artwork that incorporates computerized lighting that creates art with lighting. The artwork lighting is programmed to create patterns, colors and movements on site that are not related in any way to pedestrian security lighting or required site lighting. The artwork lighting is also motion controlled to create different patterns depending on how many pedestrians are present on site. Can this artwork lighting be excluded from the EA Credit 1 (Optimize Energy Performance) calculations?
