Rating System
LEED BD+C: New Construction, LEED BD+C: Core and Shell, LEED BD+C: Schools, LEED BD+C: Healthcare
Rating System Version
v3 - LEED 2009, v2 - Schools 2007, v2 - LEED 2.2, v2 - LEED 2.0
Inquiry
The project contains both systems furniture (42" application) for open areas, and modular wall systems (full height application that is demountable and reusable such as the DIRTT system). We are trying to schedule flush-out activities and understand from other CIRs that furniture installation may occur during or after flushout. Are modular walls as described here considered furniture?