Accessibility Tools

  • Increase text
  • Decrease text
  • High contrast
  • Negative contrast
  • Add grayscale
  • Remove grayscale
  • Add lightbackground
  • Remove lightbackground
  • Reset
Created on LEED Interpretation

ID#

li-2054

Credit NameEQp1 - Minimum IAQ performance
Credit CategoryIndoor environmental quality
International ApplicableYes

Rating System

LEED BD+C: New Construction, LEED BD+C: Schools, LEED ID+C: Commercial Interiors, LEED BD+C: Core and Shell, LEED O+M: Existing Buildings

Rating System Version

v2 - LEED 2.2, v2 - Schools 2007, v2 - LEED 2.0, v2 - LEED 2.0, v3 - LEED 2008

Inquiry

We conform to most of the requirements of EQ Prerequisite 1 but it was found that some of them are not applicable to Hong Kong. In Section 5 of ASHRAE 62.1-2004 Systems and Equipment, it requires the installation of dehumidification (5.10), finned-tube coils and heat exchangers (5.12) and humidifiers and water-spray systems (5.13). Due to the hot and humid climate in Hong Kong it is not common to install them in the building and it is considered not environmentally sound to install them if they are not going to be used during the operation of the building. As thus, we ask for waiver for this requirement.

Logging out the application..