ID#
li-2085
| Credit Name | SSc6.1 - Stormwater design - quantity control |
|---|---|
| Credit Category | Sustainable sites |
| International Applicable | Yes |
Rating System
LEED BD+C: New Construction, LEED BD+C: New Construction, LEED BD+C: Schools, LEED BD+C: Schools, LEED BD+C: Core and Shell, LEED O+M: Existing Buildings, LEED O+M: Existing Buildings
Rating System Version
v2 - LEED 2.2, v3 - LEED 2009, v2 - Schools 2007, v3 - LEED 2009, v3 - LEED 2009, v3 - LEED 2008, v3 - LEED 2009
Inquiry
For this project, the proposed condition reduces the existing impervious area by 38% below the existing condition, therefore the project received a waiver for storm water management, quantity control. Stormwater management requirements were met by reducing the existing impervious area on site. The "2000 Maryland Stormwater Management Design Manual" requires a reduction on 20% of existing impervious to meet stormwater management requirements and, in this project, an impervious area reduction of 38% was achieved. If by reducing the existing impervious area by 38%, does our project meet the requirement of the credit?
