Accessibility Tools

  • Increase text
  • Decrease text
  • High contrast
  • Negative contrast
  • Add grayscale
  • Remove grayscale
  • Add lightbackground
  • Remove lightbackground
  • Reset
Created on LEED Interpretation

ID#

li-2087

Credit NameSSc6.2 - Stormwater design - quality control
Credit CategorySustainable sites
International ApplicableYes

Rating System

LEED BD+C: New Construction, LEED BD+C: New Construction, LEED BD+C: Schools, LEED BD+C: Schools, LEED BD+C: Core and Shell

Rating System Version

v2 - LEED 2.2, v3 - LEED 2009, v2 - Schools 2007, v3 - LEED 2009, v3 - LEED 2009

Inquiry

For this project, the proposed condition reduces the existing impervious area by 38% below the existing condition, therefore the project received a waiver for storm water management, quantity control. Stormwater management requirements were met by reducing the existing impervious area on site. The "2000 Maryland Stormwater Management Design Manual" requires a reduction on 20% of existing impervious to meet stormwater management requirements and, in this project, an impervious area reduction of 38% was achieved. If by reducing the existing impervious area by 38%, does our project meet the requirement of the credit?

Logging out the application..