ID#
li-2193
| Credit Name | SSc4.2 - Alternative transportation - bicycle storage and changing rooms |
|---|---|
| Credit Category | Sustainable sites |
| International Applicable | Yes |
Rating System
LEED BD+C: New Construction, LEED BD+C: New Construction, LEED BD+C: Schools, LEED BD+C: Schools, LEED ID+C: Commercial Interiors, LEED ID+C: Commercial Interiors, LEED BD+C: Core and Shell, LEED BD+C: Core and Shell
Rating System Version
v2 - LEED 2.2, v3 - LEED 2009, v2 - Schools 2007, v3 - LEED 2009, v2 - LEED 2.0, v3 - LEED 2009, v2 - LEED 2.0, v3 - LEED 2009
Inquiry
We are requesting approval of an alternate compliance path with regards to the quantity of showers required to comply with Sustainable Sites Credit 4.2 in the LEED NCv2.2 rating system. Our project, located in Cairo, Egypt, provides areas within the building for prayer and ablution areas adjacent to it used for ritual cleansing before prayer time. Each ablution area, one each for males and females, will have four sinks that are actually shower-like faucets on a wall above a trough for a total of eight sinks. We will send a photo example separately. There are no walls or enclosures around each of the sinks, although there are separate ablution areas for men and women. Users remain robed while using the sinks, except for socks, shoes and jackets. Users will typically roll up their sleeves and using a washcloth wash their arms, armpits, face, hair, feet and lower legs. While these ablution areas are used for religious practice, it is common and socially acceptable to use them for general washing as well. Furthermore, social norms do not dictate full daily washings that are typical of American culture, making "sponge" bathing a more common practice for personal hygiene for the majority of the population. We are proposing that each bathing fixture in each ablution area be counted as an individual shower, in our case eight in total. In order to fulfill the need of all occupants of the building, four regular showers, two for each gender, will also be provided in the building for occupants that wish to use a full shower and changing facility. Our building has an FTE of 1080, which requires 5.4 showers, or 3 for each gender. We believe that access to the 4 showers and 8 ablution sinks meets the intent of the credit while also being more appropriate for the social customs of the culture. Is this approach acceptable?
