ID#
li-2293
| Credit Name | SSc7.2 - Heat island effect - roof |
|---|---|
| Credit Category | Sustainable sites |
| International Applicable | Yes |
| Campus Applicable | No |
Rating System
LEED BD+C: New Construction, LEED O+M: Existing Buildings, LEED BD+C: Core and Shell, LEED BD+C: Schools
Rating System Version
v3 - LEED 2009, v3 - LEED 2008, v2 - Schools 2007, v2 - LEED 2.2
Inquiry
In an effort to reduce heat islands, the car park for this hotel project is covered. All of the building car park is at ground level (there is no basement). The car park cover is made up of both the hotel building and a podium area that extends out from the hotel. The roof area includes: Podium Roof: 1. Green roof area - 394m2 2. Hardscaped area - 832m2 (The hardscaped area is in two parts. An area on one side of the building for pedestrian use and an area at the rear of the building which contains a vehicular ramp where cars will drive over the corner of the site) 3. Total podium roof area (1+2) = 1226m2 Building Roof: 4. Total footprint (including stairs & plant) - 1084m2 5. Total footprint (excluding stairs & plant) - 836m2 Can the podium roof (including the green roof) be included in the total roof surface for this project?
