ID#

li-2294

Credit NameEAc3.1 - Performance measurement - building automation system
Credit CategoryEnergy & atmosphere
International ApplicableYes
Campus ApplicableNo

Rating System

LEED O+M: Existing Buildings

Rating System Version

v3 - LEED 2009, v3 - LEED 2008, v2 - LEED 2.0

Inquiry

Our project is registered under LEED EB 2.0. The project is an existing building of approximately 120,000 square feet of which 100,000 square feet is general office space and 20,000 square feet is manufacturing and warehouse. For the purposes of certification we are only attempting to certify the office portion of the building. Within EAc5.1-5.3, there are three actions that deal with sub-metering process utility usage: - Separate building electrical meters that allow aggregation of all process electrical loads; - Separate building natural gas loads that allow aggregation of all process natural gas loads; - Separate meters that allow aggregation of all indoor process water use. Because we are attempting to certify only the office portion of the facility, we will include sub-meters that track all utility usage of the manufacturing area. This will allow for true tracking of actual utility use in the office area, by subtracting the sub-metered data from the overall building meter data. We would like to know if this sub-metering of the manufacturing area would allow us to capture the three credits noted above. We believe that the manufacturing area comprises all process loads as noted, but also realize that the manufacturing area is, technically, outside the scope of the certification. Nevertheless, the sub-metering will take place, and will give the owner accurate and on-going performance data which is the goal of the credit.