Accessibility Tools

  • Increase text
  • Decrease text
  • High contrast
  • Negative contrast
  • Add grayscale
  • Remove grayscale
  • Add lightbackground
  • Remove lightbackground
  • Reset
Created on LEED Interpretation

ID#

li-2530

Credit NameMRp1 - Sustainable purchasing policy
Credit CategoryMaterial & resources
International ApplicableYes
Campus ApplicableNo

Rating System

LEED O+M: Existing Buildings

Rating System Version

v3 - LEED 2009, v3 - LEED 2008

Inquiry

The building we are applying for LEED-EB O&M certification is an office building located on a "campus" with other building facilities. Lamps for the lighting fixtures are purchased by a building management contractor for this campus as a whole and then distributed to each individual building. No tracking mechanism for the purchasing for each individual building is in place; however, the building is set up to track how often a lamp is being replaced and a total count of lamps for each building is available. To track reduced mercury content in lamps we are proposing that a policy be set in place for the campus as a whole to ensure that the inventory of lamps purchased meets credit requirements. In addition, while the actual number of lamps installed in a building is not tracked, we propose that the quantity of lamps is able to be tracked via disposal quantities. Each lamp that is removed from the building is recycled through a hazardous waste management program and inventoried when packaged for disposal. In addition, building changes that result in a change in the total number of lamps in the building will be documented through the respective material purchasing and waste disposal credits and the documents supporting this credit will be updated accordingly.

Logging out the application..