For the Exterior Wall Framing and Interior Wall Framing components, can a project be awarded 1/2 point total if the EPP specification is met for 45% of each of the two components, even if the EPP specification is not met for 90% of either?
By clicking logout button below, you will be logged out of all the USGBC and GBCI applications in this browser.
Click the logout button below to continue logging out or cancel button to stay logged in.