EQ 6.2 (a) requires "Size the opening to 1 square inch per cfm of supply (this area may include free area undercut below door)", and allows various strategies including returns, transfer grilles, or jump ducts. If a project has a return that is suited to the distribution system, but is smaller than 1 square inch per CFM, can it still earn the point?
By clicking logout button below, you will be logged out of all the USGBC and GBCI applications in this browser.
Click the logout button below to continue logging out or cancel button to stay logged in.