Created on LEED Interpretation

ID#

li-2620

Credit NameEAc1 - Optimize energy performance
Credit CategoryEnergy & atmosphere
International ApplicableYes

Rating System

LEED BD+C: New Construction, LEED BD+C: New Construction, LEED BD+C: Schools, LEED BD+C: Schools, LEED ID+C: Commercial Interiors, LEED BD+C: Core and Shell, LEED O+M: Existing Buildings

Rating System Version

v2 - LEED 2.2, v3 - LEED 2009, v2 - Schools 2007, v3 - LEED 2009, v3 - LEED 2009, v3 - LEED 2009, v3 - LEED 2009

Inquiry

The question is based on ASHRAE 90.1 requirements for Performance Rating Method for building modeling. This building has very high internal loads with the baseline process load at 49% of the total building energy based on actual equipment. The internal load is primarily computer desktops and monitors. Both baseline and proposed building energy usage numbers are based on a calculation worksheet as published by the US dept of Energy for computer desktops and monitors. The Energy Star usage value increases the proposed energy building performance reduction by 10-15%. This lower value for the process load is still above the 25% requirement for the total building energy amount as outlined in the LEED requirements of this point. The equipment in the new building that the owner will provide will consist of Energy Star computer desktops and monitors. We request clarification that we can run the baseline with standard energy load based on LBNL 2007 standards and proposed building with Energy Star energy loads.