The Mid-rise Guidelines for California indicate that projects should earn 1 LEED point for every 5% of the annual reference electrical load met by a renewable energy system. However, the low-rise Rating System awards 1 LEED point per 3% offset. Which is correct?
By clicking logout button below, you will be logged out of all the USGBC and GBCI applications in this browser.
Click the logout button below to continue logging out or cancel button to stay logged in.