Accessibility Tools

  • Increase text
  • Decrease text
  • High contrast
  • Negative contrast
  • Add grayscale
  • Remove grayscale
  • Add lightbackground
  • Remove lightbackground
  • Reset
Created on LEED Interpretation

ID#

li-2664

Credit NameEAc6 - Space heating and cooling equipment
Credit CategoryIndoor environmental quality
International ApplicableNo

Rating System

LEED BD+C: Homes

Rating System Version

v3 - LEED 2008

Inquiry

The V&S Guidelines indicate that the Green Rater should verify "calculation of total effective length (TEL) for the longest supply and return duct run." What if the TEL is embedded within the software, or the HVAC contractor uses a different method for calculating friction or pressure drop across the ductwork?

Logging out the application..