Accessibility Tools

  • Increase text
  • Decrease text
  • High contrast
  • Negative contrast
  • Add grayscale
  • Remove grayscale
  • Add lightbackground
  • Remove lightbackground
  • Reset
Created on LEED Interpretation

ID#

li-2744

Credit NameEAc6 - Space heating and cooling equipment
Credit CategoryIndoor environmental quality
International ApplicableNo

Rating System

LEED BD+C: Homes

Rating System Version

v3 - LEED 2008

Inquiry

Is a separate Manual D calculation required if the units have hydronic heating, and include flow control valves?

Logging out the application..