For part (c), can the credit be earned if the project is able to demonstrate that each hot water branch line (i.e. each supply line from the water heater to a fixture) holds less than 0.5 gallons of water?
By clicking logout button below, you will be logged out of all the USGBC and GBCI applications in this browser.
Click the logout button below to continue logging out or cancel button to stay logged in.