ID#
li-3000
| Credit Name | MRc2.1 - Construction waste management - divert 50% from disposal |
|---|---|
| Credit Category | Material & resources |
| International Applicable | Yes |
Rating System
LEED BD+C: New Construction, LEED BD+C: New Construction, LEED BD+C: New Construction, LEED BD+C: Schools, LEED BD+C: Schools, LEED ID+C: Commercial Interiors, LEED ID+C: Commercial Interiors, LEED BD+C: Core and Shell, LEED BD+C: Core and Shell, LEED O+M: Existing Buildings, LEED O+M: Existing Buildings, LEED O+M: Existing Buildings
Rating System Version
v2 - LEED 2.2, v2 - LEED 2.2, v3 - LEED 2009, v2 - Schools 2007, v3 - LEED 2009, v2 - LEED 2.0, v3 - LEED 2009, v2 - LEED 2.0, v3 - LEED 2009, v2 - LEED 2.0, v3 - LEED 2008, v3 - LEED 2009
Inquiry
Our project is located in Los Angeles, California. Construction waste is sorted at the jobsite into various boxes i.e. wood, metal, concrete/inert material, drywall/gypsum, co-mingled recycled waste (small wood scraps, wire cuttings, conduit, metal stud cut offs, etc.), and general trash boxes. A contracted hauler regularly collects these boxes. General trash is taken directly to the landfill where it is weighed and then buried. Separated recycling materials are taken to various certified City of Los Angeles recycling facilities where they are weighed and processed. Co-mingled recycled waste is taken to special certified recycling facilities where the co-mingled mix is weighed and then the recyclable materials are removed from the mix and sent to appropriate facilities for processing. This process does not allow for each recyclable material type from the co-mingled load to be weighed separately. The City of Los Angeles\' Department of Sanitation audits all of the co-mingled sorting facilities on a regular basis and establishes a yearly average recycling percentage rate for "each" facility. The certification recycling percentage rates vary. When calculating the construction waste recycling percentage for MRc2.1, will the USGBC accept the City of Los Angeles\' annual recycling percentage rate for the "specific" facility that accepts this LEED project\'s co-mingled component of the project\'s waste stream?
