ID#
li-5086
| Credit Name | SSc4.4 - Alternative transportation - parking capacity |
|---|---|
| Credit Category | Sustainable sites |
| International Applicable | No |
Rating System
LEED BD+C: New Construction, LEED BD+C: New Construction, LEED BD+C: New Construction, LEED BD+C: New Construction, LEED BD+C: Schools, LEED BD+C: Schools, LEED ID+C: Commercial Interiors, LEED ID+C: Commercial Interiors, LEED BD+C: Core and Shell, LEED BD+C: Core and Shell
Rating System Version
v2 - LEED 2.0, v2 - LEED 2.2, v2 - LEED 2.2, v3 - LEED 2009, v2 - Schools 2007, v3 - LEED 2009, v2 - LEED 2.0, v3 - LEED 2009, v2 - LEED 2.0, v3 - LEED 2009
Inquiry
Our project is a 360,000 sq.ft. hospital located in an urban setting on a University campus. This 9 storey building was constructed overtop of an existing hospital Emergency ward. During construction 56 parking spaces that serve the Emergency were taken over for site enabling and will be reconstructed on site using 13 less spaces than what originally existed. This parking is for the purpose of serving the Emergency not our project, however the construction of this parking is part of the scope of work for our project. Since the project is located on a University campus there are 4 existing campus parkades located adjacent the site that can be used to serve the project\'s parking needs, so our project has not added any additional parking for this building. Also an existing bicycle storage area located in one of the parkades will also serve the project. Based on previous CIR Rulings, LEED allows some flexibility in determining the extent of the site area for purposes of LEED. However, a specific site area must be defined and used consistently for achievement of all credits. Typically, campus projects define an area associated with the specific construction site as the site area, rather than addressing the campus as a whole. Our project has planned to exclude all existing campus parkades from our LEED site boundary and therefore from our calculations as they are not part of our scope of work for construction. Can we do this considering building occupants will use these parkades to park vehicles and store bicycles? Can we also exclude the parking spaces that are for the existing Emergency not our project? Please note we are submitting for certification under LEED-NC v2.1.