Accessibility Tools

  • Increase text
  • Decrease text
  • High contrast
  • Negative contrast
  • Add grayscale
  • Remove grayscale
  • Add lightbackground
  • Remove lightbackground
  • Reset
Created on LEED Interpretation

ID#

li-5089

Credit NameEAc5 - Measurement and verification
Credit CategoryEnergy & atmosphere
International ApplicableYes

Rating System

LEED BD+C: New Construction, LEED BD+C: New Construction, LEED BD+C: Core and Shell

Rating System Version

v2 - LEED 2.2, v3 - LEED 2009, v3 - LEED 2009

Inquiry

To meet the requires of LEED-NC Version 2.2, EA Credit 5, are there any end uses that require continuously metering when IPMVP Option D is used? Specifically the end uses required under LEED-NC Version 2.1 were: 1. Lighting systems and controls 2. Constant and variable load motors 3. Variable frequency drive (VFD) operation 4. Chiller efficiency at variable loads (kW/ton) 5. Cooling load 6. Air and water economizer and heat recovery cycles 7. Air distribution static pressure and ventilation air volumes 8. Boiler efficiencies 9. Building-related process energy systems and equipment 10.Indoor water risers and outdoor irrigation systems Or, can these end uses be captured as an aggregate at the utility meter?

Logging out the application..