ID#
li-5098
| Credit Name | MRc2 - Construction waste management |
|---|---|
| Credit Category | Material & resources |
| International Applicable | Yes |
Rating System
LEED BD+C: New Construction, LEED BD+C: New Construction, LEED BD+C: Schools, LEED BD+C: Schools, LEED ID+C: Commercial Interiors, LEED ID+C: Commercial Interiors, LEED BD+C: Core and Shell, LEED BD+C: Core and Shell
Rating System Version
v2 - LEED 2.2, v3 - LEED 2009, v2 - Schools 2007, v3 - LEED 2009, v2 - LEED 2.0, v3 - LEED 2009, v2 - LEED 2.0, v3 - LEED 2009
Inquiry
When removing petroleum contaminated soils there are two options for disposal. One would be to haul the contaminated soils to a hazardous materials landfill. The other option is to incinerate the soil to burn off the petroleum and remediate the soil into a environmentally safe product. In the case of Biomed project we elected to have the contaminated soils recycled (incinerated). During the site cleanup WT removed 787.4 TONS of contaminated soils from the project site. We are currently applying for the "Brownfield Credit" which all of this documentation will be sent to document the cleanup. Also LEED specifically says that land clearing waste (soils) cannot be included in the waste management plan, but for this case we feel that because of the soils were recycled from a hazardous material that we should be able to apply the tonnage to our waste management calculations. Can we use this toward this credit too?