Accessibility Tools

  • Increase text
  • Decrease text
  • High contrast
  • Negative contrast
  • Add grayscale
  • Remove grayscale
  • Add lightbackground
  • Remove lightbackground
  • Reset
Created on LEED Interpretation

ID#

li-5142

Credit NameIDc1 - Innovation in design
Credit CategoryInnovation
International ApplicableYes

Rating System

LEED BD+C: New Construction, LEED BD+C: New Construction, LEED BD+C: New Construction, LEED BD+C: New Construction, LEED BD+C: Schools, LEED BD+C: Schools, LEED ID+C: Commercial Interiors, LEED ID+C: Commercial Interiors, LEED BD+C: Core and Shell, LEED BD+C: Core and Shell

Rating System Version

v2 - LEED 2.0, v2 - LEED 2.2, v2 - LEED 2.2, v3 - LEED 2009, v2 - Schools 2007, v3 - LEED 2009, v2 - LEED 2.0, v3 - LEED 2009, v2 - LEED 2.0, v3 - LEED 2009

Inquiry

This project involves the construction of a land mark addition to one of the world\'s premier art museums. As such a world famous architect based out of Paris, France was contracted to design the 260,000 square foot addition. We would like to propose an innovation in design credit based on electronic transmission of submittal review packages with the assumption that we will be saving sending hardcopies back and forth to Europe. Would the following be considered for an innovation credit? Credit Intent: Reduce the project\'s carbon footprint Credit Requirements: 1. Document the total number of submittal packages reviewed by the architect. For the purposes of the calculations, we will assume a standard submittal package size of 10 pages of 11x17 paper, and five copies of each submittal 2. Based on the above assumption, calculate a total weight of submittal packages that would have been sent to Europe. 3. Provide evidence of the weight capacity and fuel use of a standard aircraft used to ship packages to Europe. 4. Indicate the total savings of harmful emissions from NOT shipping hard copies of the submittal packages. As a side note, the use of electronic transmission not only reduces the project\'s carbon footprint, but has the added benefit of faster review of the submittals, likely reducing the overall time of construction.

Logging out the application..