Accessibility Tools
LEED BD+C: Homes, LEED BD+C: Multifamily Midrise
v3 - LEED 2008
EQ 2.1 requires a CO Detector "on every floor." In a multi-family project, does that mean a CO detector is required on every floor for every unit?
By clicking logout button below, you will be logged out of all the USGBC and GBCI applications in this browser.
Click the logout button below to continue logging out or cancel button to stay logged in.