Accessibility Tools

  • Increase text
  • Decrease text
  • High contrast
  • Negative contrast
  • Add grayscale
  • Remove grayscale
  • Add lightbackground
  • Remove lightbackground
  • Reset
Created on LEED Interpretation

ID#

li-5327

Credit NameEAc7 - Water heating
Credit CategoryEnergy & atmosphere
International ApplicableNo
Campus ApplicableNo

Rating System

LEED BD+C: Homes, LEED BD+C: Multifamily Midrise

Rating System Version

v3 - LEED 2008

Inquiry

For horizontal pipe runs that run through wood studs, can the credit be met if the pipe is only insulated between the studs - so oversized holes are not needed to accommodate the insulation?

Logging out the application..