ID#
li-5380
| Credit Name | SSc1 - Site selection |
|---|---|
| Credit Category | Sustainable sites |
| International Applicable | No |
| Campus Applicable | No |
Rating System
LEED BD+C: New Construction, LEED O+M: Existing Buildings, LEED ID+C: Commercial Interiors, LEED BD+C: Core and Shell, LEED BD+C: Schools
Rating System Version
v3 - LEED 2009, v3 - LEED 2008, v2 - Schools 2007, v2 - LEED 2.2, v2 - LEED 2.0
Inquiry
SS Credit 1 Option D: Heat Island Reduction, Non-Roof Intent: Reduce heat islands to minimize impact on habitat. Requirement: Locate the tenant space in a building where at least 30% of the site\'s non-roof impervious surfaces including parking areas, walkways, etc., uses light-colored/high-albedo materials with a Solar Reflectance Index (SRI) of at least 30. Situation: Tenant is municipal employees who will be located in the administrative area of a building that is part of a water treatment plant. There are two large circular in-ground water storage tanks that are a part of the water treatment process on the site. These tanks have permanent, impervious covers that have a durable coating with a high SRI value, and will be in place at the time of submittal for this project. Strategy under consideration: Consider the tanks to be a part of the site\'s non-roof impervious surfaces with an SRI index greater than 30, in order to provide the required percentage of light-colored, non-roof impervious surface area on the site (30%) needed to earn 1/2 point under Option D. Are we allowed to include the surface area of these tank covers in our calculation of the percentage of non-roof impervious surface area materials having SRI of 30 or higher?