The LEED Resource Guide 2.0 explains in the Calculations and the LEED Energy Modeling Protocol (p. 92-93 of the unformatted review draft) that on site renewable energy (photovoltaics in our case) is deducted from the Proposed Building Energy Cost. Is this "double-dipping"? Please verify that this is possible as we see no cross-referencing anywhere else in the guide for this strategy.
By clicking logout button below, you will be logged out of all the USGBC and GBCI applications in this browser.
Click the logout button below to continue logging out or cancel button to stay logged in.