Accessibility Tools

  • Increase text
  • Decrease text
  • High contrast
  • Negative contrast
  • Add grayscale
  • Remove grayscale
  • Add lightbackground
  • Remove lightbackground
  • Reset
Created on LEED Interpretation

ID#

li-5514

Credit NameSSc6.2 - Stormwater management - treatment
Credit CategorySustainable sites
International ApplicableYes
Campus ApplicableNo

Rating System

LEED BD+C: New Construction

Rating System Version

v2 - LEED 2.1

Inquiry

Could you please clarify the submittal requirements for LEED 2.0 SS Credit 6.2? [1] The LEED 2.0 June 2001 reference guide requires only drawings and specifications for this credit submittal. However, the Word document that we received as part of our project registration packet calls for drawings, specs, AND CALCULATIONS. [2] To add to the confusion, the June 2001 reference guide has example calculations for only Credit 6.1, NOT 6.2. At the same time, though, Credit 6.2 is referring to percentages of TSS and TP, so I would assume that a calculation of some sort would be necessary.

Logging out the application..