Created on LEED Interpretation
ID#
li-5564
| Credit Name | MRc3.1 - Resource reuse - 5% |
|---|---|
| Credit Category | Material & resources |
| International Applicable | Yes |
| Campus Applicable | No |
Rating System
LEED BD+C: New Construction
Rating System Version
v2 - LEED 2.1
Inquiry
For Materials and Resources Credits 3 through 6, the calculation is based on the cost of all construction materials and products as a percentage of the total cost of all materials for the project. Material cost excludes installation (e.g. equipment and labor). Our question is regarding the cost of formwork used during construction. Should this be included as part of the material costs of the project even though it is not permanently installed in the building? Or would it be acceptable to consider it an equipment cost and therefore excluded from the total material cost of the project? What are the implications for resource reuse and local/regional materials points?