Created on LEED Interpretation

ID#

li-5564

Credit NameMRc3.1 - Resource reuse - 5%
Credit CategoryMaterial & resources
International ApplicableYes
Campus ApplicableNo

Rating System

LEED BD+C: New Construction

Rating System Version

v2 - LEED 2.1

Inquiry

For Materials and Resources Credits 3 through 6, the calculation is based on the cost of all construction materials and products as a percentage of the total cost of all materials for the project. Material cost excludes installation (e.g. equipment and labor). Our question is regarding the cost of formwork used during construction. Should this be included as part of the material costs of the project even though it is not permanently installed in the building? Or would it be acceptable to consider it an equipment cost and therefore excluded from the total material cost of the project? What are the implications for resource reuse and local/regional materials points?

Logging out the application..