Accessibility Tools

  • Increase text
  • Decrease text
  • High contrast
  • Negative contrast
  • Add grayscale
  • Remove grayscale
  • Add lightbackground
  • Remove lightbackground
  • Reset
Created on LEED Interpretation

ID#

li-5565

Credit NameMRp1 - Storage and collection of recyclables
Credit CategoryMaterial & resources
International ApplicableNo
Campus ApplicableNo

Rating System

LEED BD+C: New Construction

Rating System Version

v2 - LEED 2.1

Inquiry

For Materials and Resources Prerequisite 1, we would like to clarify the requirements for multi-family/multi-story residential projects. We are proposing to include central recycling areas, easily accessible to all occupants. Our project consists of two high rise towers and one level of townhouses. On level P1 of each tower we will provide a 260 square foot area dedicated to the collection and storage of recyclables. The ground floor will include a 100 square foot recycling area for townhouse residents. Our project includes space for the collection and separation of: glass and plastic bottles paper cardboard aluminum cans Total building square footage (minus parking) = 463,537 Number of residential units = 246 Total square footage of recycling area = 620 There will not be separate space for collection of recyclables on each floor. Please confirm that our approach will meet the requirements of Materials and Resources Prerequisite 1.

Logging out the application..