Accessibility Tools

  • Increase text
  • Decrease text
  • High contrast
  • Negative contrast
  • Add grayscale
  • Remove grayscale
  • Add lightbackground
  • Remove lightbackground
  • Reset
Created on LEED Interpretation

ID#

li-5707

Credit NameMRc1.1 - Building reuse - maintain 75% of existing walls, floors and roof
Credit CategoryMaterial & resources
International ApplicableNo
Campus ApplicableNo

Rating System

LEED BD+C: New Construction

Rating System Version

v2 - LEED 2.1

Inquiry

Our project has saved over 94% of the structure and shell and 65% of the non-shell items. Using the MRc1.2 CIR ruling dated 4-10-03 (equivalence granted for reuse of 98% shell/structure plus 20% non-shell/structure), will we be able to earn MRc1.2 (with non-shell items making up the difference) and subsequently have enough "left over" to also earn MRc1.3? If this is not permissible, can MRc1.3 be earned without first earning MRc1.1 and MRc1.2?

Logging out the application..