ID#
li-5726
| Credit Name | EAc1 - Optimize energy performance |
|---|---|
| Credit Category | Energy & atmosphere |
| International Applicable | No |
| Campus Applicable | No |
Rating System
LEED BD+C: New Construction
Rating System Version
v2 - LEED 2.1
Inquiry
Our project is a college residence hall in downtown Boston. Energy for heating will be purchased from a steam utility company, so the project will not include boilers. In calculating the energy performance of this building above the minimum requirements of ASHRAE 90.1-1999, can we compare a standard efficiency steam boiler as our base case (Energy Cost Budget)and a higher efficiency boiler (reflecting the higher efficiencies of the district steam boilers) as the design case (Design Energy Cost)? For example: To calculate the Energy Cost Budget: A building with an 80% efficient standard steam boiler (as per ASHRAE 90.1 1999, Table 6.2.1F). To calculate the Design Energy Cost: A building with a high efficiency steam boiler with equivalent efficiency as the district steam boilers(typical efficiency 85 to 88 %). We will document the exact efficiency of district steam boilers with a letter from the utility as part of the project LEED documentation.
