Created on LEED Interpretation

ID#

li-5906

Credit NameEAc5 - Measurement and verification
Credit CategoryEnergy & atmosphere
International ApplicableYes

Rating System

LEED BD+C: New Construction

Rating System Version

v2 - LEED 2.0

Inquiry

The question that we have is concerning metering the facility with the whole building energy meters versus individual system metering. We believe that the LEED reference documentation for metering which is the "International Performance Measurement & Verftification Protocol, Concepts and Options for Determining Energy Savings", by the Office of Energy Efficiency and Renewable Energy, U.S. Dept. of Energy, October 2000, under chapter 3, defines that whole building metering is acceptable. If an Energy Conservation Measure (ECM) needs to be specifically measured, it could be measured on a "temporay, isolated" meter reading. We would like the USGB to review this interpretation and advise us at their earliest convenience.

Logging out the application..