Accessibility Tools

  • Increase text
  • Decrease text
  • High contrast
  • Negative contrast
  • Add grayscale
  • Remove grayscale
  • Add lightbackground
  • Remove lightbackground
  • Reset
Created on LEED Interpretation

ID#

li-6031

Credit NameEAc3 - Additional commissioning
Credit CategoryEnergy & atmosphere
International ApplicableNo

Rating System

LEED BD+C: New Construction

Rating System Version

v2 - LEED 2.2

Inquiry

We are submitting this credit interpretation request for a new county public services office building currently in the design phase. The Design/Build (D/B) team requests a clarification to ensure that our strategies are in accordance with LEED requirements. Credit EA3.0 states that an independent commissioning authority must conduct a review of the design, conduct a review of the construction documents, and review the contractor submittals to verify and ensure that the entire building is designed, constructed and calibrated to operate as intended. Our request is to verify the relationship of the commissioning authority to the rest of the DB team. In order to minimize costs for the client and maximize the project\'s life cycle efficiency, the D/B team has contracted a Utility Service Provider (USP) to serve as a strategic partner in providing a state-of-the-art mechanical/electrical/plumbing (M/E/P) infrastructure. The USP is charged with procuring design, constructing, financing, operating and maintaining the mechanical/electrical facilities over the life of the building. The USP will act as the M/E/P manager for the project and has contracted with a third-party M/E/P firm to perform design/engineering of M/E/P systems and act as the engineers of record for the project. The USP wishes to contract a Senior Performance Assurance Specialist

Logging out the application..