Credit NameSSp1 - Construction activity pollution prevention
Credit CategorySustainable sites
International ApplicableNo
Campus ApplicableNo

Rating System

LEED BD+C: New Construction

Rating System Version

v2 - LEED 2.0

Inquiry

We are working on a new 165,000 square-foot building for Vista Community College in downtown Berkeley. The building is on an urban-infill site that is completely built-out to the lot line. The LEED Reference Guide states that the Erosion & Sedimentation Control plan should include the following information: 1. Statement of erosion control and stormwater control objectives. 2. Comparison of post-development stormwater runoff conditions with predevelopment conditions. 3. Description of all temporary and permanent erosion control and stormwater control measures implemented on the project site." 4. Description of the type and frequency of maintenance activities required for the chosen erosion control methods. Regarding Item 1, we believe that the objectives statement for this project should indicate that the only sedimentation/erosion issues are related to temporary pollution prevention at the public storm sewer during construction. There is no other anticipated means of runoff from this urban infill site during or after construction. Regarding item #2, we are assuming that post- versus predevelopment runoff will be similar, given that this was previously a developed site with impervious surfaces. Regarding item #3, we have a Stormwater Pollution Prevention plan submitted by the Contractor that can be provided to describe temporary measures concerning protection of the storm sewer during construction. The project does not include any permanent landscaping or topography subject to erosion. Item #4 is not applicable since permanent erosion control is not necessary. Question: Are the above statements and the inclusion of the Contractor\'s Stormwater Pollution Prevention plan adequate to achieve the pre-requisite?

Logging out the application..