Accessibility Tools

  • Increase text
  • Decrease text
  • High contrast
  • Negative contrast
  • Add grayscale
  • Remove grayscale
  • Add lightbackground
  • Remove lightbackground
  • Reset
Created on LEED Interpretation

ID#

li-6186

Credit NameEQc2 - Ventilation effectiveness
Credit CategoryIndoor environmental quality
International ApplicableYes

Rating System

LEED BD+C: New Construction

Rating System Version

v2 - LEED 2.2

Inquiry

We are giving our best shot to utilize natural ventilation, heating and cooling for the 8 month target identified in the program, but finding it quite difficult in the shoulder seasons. For the four months with the switch on: Is this an equivelent amount of time during the year when no energy is being consumed? For example, the switch on for no more then about 2800 hours during the year, which is about 4 months of time, but the switch is turned on and off over the year, Does it need to be consecutive?

Logging out the application..