FM Logistic Bedzin Stage 3
Certification level: Gold
Project info
| Size | 11,676 sq m |
|---|
PERFORMANCE HIGHLIGHTS
over 50% reduction of potable water use
over 75% of construction waste recycled
37% of energy cost reduction
LOCATION AND TRANSPORTATION
FM Logistic Będzin Stage 3 Platform aims to facilitate sustainable utilization of the environment and site use through implementation of LEED requirements. Implemented strategies help achieve the following LEED requirements:
Light pollution reduction – proper selection of light fixtures
Heat island effect prevention – High SRI roofing membrane
SUSTAINABLE SITES
FM Logistic Będzin Stage 3 Platform aims to facilitate sustainable transport and land use through implementation of LEED requirements. The site location and implemented strategies help achieve the following LEED requirements:
Alternative transportation – 10 parking spaces reserved for fuel efficient vehicles
Bicycle facilities - 28 bicycle racks provided for the building users
WATER EFFICIENCY
FM Logistic Będzin Stage 3 Platform aims to achieve 8 points for Water Efficiency by incorporating the following green building strategies:
Water efficient fixtures ensuring over 50% reduction of potable water use
Smart flush fixtures ensuring over 50% water savings for flushing
Planting landscaping that requires no watering
ENERGY EFFICIENCY
FM Logistic Będzin Stage 3 Platform aims to achieve 21 points for Energy Efficiency by incorporating the following green building strategies:
LED lighting ensuring energy savings
High efficiency heating ensuring effective operations
Energy meters and measurement and verification plans
MATERIALS & RESOURCES
FM Logistic Będzin Stage 3 Platform aims to achieve 7 points for Materials and Resources by incorporating the following green building strategies:
Implementing products with low VOC
Implementing products with EPD certificates
INDOOR ENVIRONMENTAL QUALITY
People spend 80-90%of their time indoors, so indoor environmental quality is crucial to their wellbeing. Green building strategies at FM Logistic Będzin Stage 3 aim to create a superior building environment through:
Outdoor air delivery monitoring – measuring CO2 levels and signaling the need for ventilation in regularly occupied areas.
Quality views - over 70% of regularly occupied areas have access to quality views.
Environmental Tobacco Smoke - No smoking is allowed on project site within 8 meters from doors, operable windows and air intakes to prevent exposure to tobacco smoke.
